06/03/2020

HAB Space and Aviation Organized Industrial Zone, GMF Yapı

In the ‘HAB Space and Aviation Organized Industrial Zone’ project, which is still under construction in Ankara’s Kazan region, ABS Plus void formworks were preferred […]
02/26/2020

Residence Project, Azur Group

ABS Void Formworks have always been the most simple, economical and fastest solution for sunken slab fillings.  In comparison to conventional alternatives, ABS Plus void formwork system provides a %95 void concrete […]
02/26/2020

Mall of Istanbul, Torunlar Construction

In the third phase of the Mall of Istanbul (MOI) shopping mall, ABS Plus void formworks were preferred as a car park ramp. The heights varied from 25 […]
02/26/2020

Nidapark Istinye, Tahincioglu

Nidapark Istinye Villas project is one of the most prestigious projects in the European side of Istanbul. This project’s motto is ‘Project Without Borders in […]
01/16/2020

Sabah Al-Salem University, SEG Qatar

Planned lightweight filling application for the Student Activities and Athletic Facilities (SAAF) was either foam (aerated) concrete or some other sort of lightweight concrete. The […]
01/15/2020

Dolmabahçe Palace, Tera Construction

Tera Construction was looking for an economical, durable and simple solution to raise the cafe’s ground clearance by 10 cm. ABS Level H5 cm was the most effective building material for this […]